High water caused a lot of extra work for us this year. At Seseganaga Lake, Joe prepared two floating docks for next summer. At Metionga Lake, Joey took the deck off the main dock and raised and levelled the stingers then redecked the dock so it will be above the high waster mark.
He then built a new walkway off the dock.
This should make things a little easier and dryer next time the water levels peak.